18 Kintore Street, Annerley

This property is a house situated in 2/RP37791 Annerley QLD. Estimated value at this time is $940,000. Constructed in 1930, featuring 3 bedrooms, 1 bathroom.

ABOUT THE PROPERTY

Bedrooms
3
Bathrooms
1
Car spaces
2
Land size
873 m2
Building size
214 m2
Council area
Brisbane - Stephens
Year built
1930
Lot plan
2/RP37791 Annerley QLD
House type
House



HISTORY

Last sold 03/02/2016
$840,000



LISTING DESCRIPTION
as of May 2019

Heathwood Bargain - 4 Bedroom Home only $482,400 House & Land Package to be Constructed with Turnkey inclusions:This Home offers you 4 Bedrooms all have Built-in-Robes and the Master Bedroom features a Walk-in-Robe and Ensuite. The Meals and Living area opens out onto the Alfresco ideal for entertaining. The Kitchen has Stainless Steel Appliances including Dishwasher. The home also has a Double Garage.Inclusions:Zero Lot FeesCouncil Fees & ApprovalsTimber Butted FenceDriveway (Covercrete)Site Retaining (Fixed Cost)Bushfire Hazard ExtrasFacade Ausbuild Finish (Front)Facade: Roof Pitch 25 degFlat Profile Roof TileSite Drainage (Fixed Cost)Site Earthworks (Fixed Cost)Site Foundation (Fixed Cost)Benchtop Kitchen (Stone)Carpet FlooringLight FittingsTV AntennaWestinghouse DishwasherWestinghouse MicrowaveAlfresco Slab (CoverCrete)Brick Letterbox (Rendered)Wall Mounted ClotheslineFibre Optic ConnectionFull Turnkey House & Land Package: $482,400.00Land Size: 487m2House Size: 171.5m2Please Note: Photographs may include upgrade items. Unless specifically listed in package detail, these items are not included in advertised price and may be added for an additional cost. Price based on noted facade and Standard Inclusions. Speak to a Consultant for full details or visit ausbuild.com.au/terms. All packages subject to developer and applicable Local Authority (Council) approval. FLEXI Packs contain allowances for construction & service costs.Additional costs may arise based on individual site, soil results. FIXED PRICE packages EXCLUDE any costs associated with foundation rock excavation/removal. 3 May 2016.